Signboards in District 8 – On-Site Survey, Turnkey Installation

Signboard making in District 8 with In Quảng Cáo Q7 is one point of contact: on-site shopfront surveys in Chanh Hung, Binh Dong and Phu Dinh, perspective design, production at our workshop 49 Mai Van Vinh, Tan Hung Ward, Ho Chi Minh City and installation on site — you don't have to coordinate printers and installers yourself.

Signboards in District 8 – A hair salon signboard with a white Alu background, gold border, metal raised letters and spotlights.
Hair salon sign with white Alu backing and gold trim, raised metal letters and spotlights.

What signboard making in District 8 covers

  • LED acrylic and stainless steel raised letters — café, spa and fashion shop fronts.
  • Alu facade + raised letters — restaurants, offices, shop chains.
  • Light boxes square, round, raised acrylic, Backlit Film translucent.
  • Hiflex banner signs on frames — economical for kiosks and newly opened venues (banner from 35.000đ/m²).
  • Glass decals for sun shading and decoration with the identity set.

Turnkey process from survey to installation

  1. Send a photo of your shopfront + approximate size via Zalo 0866.511.099 (Phone/Zalo) for material advice and a price range.
  2. We survey on site in District 8 — measuring and photographing the current state.
  3. Approve the perspective design on a photo of your own shopfront.
  4. Produced at the workshop, installation date booked; most medium signs are installed within a session.
  5. Handover and care instructions. Final price based on the survey, quoted before work.

Related products

Advertising signs

Advertising Signs

Contact us for a quote

Light boxes

Light Boxes

Contact us for a quote

Decal application

Decal Application

Contact us for a quote
From 42.000 ₫ / m²
Shop front clad in gold Alu with raised letters and edge lighting, scaffolding still on site.
Shop front clad in gold Alu with raised letters and edge lighting, scaffolding still on site.
Q7 Coffee acrylic letters and logo mounted on a café wall.
Q7 Coffee acrylic letters and logo mounted on a café wall.

Why choose a workshop near District 8

Local District 8 sign makers are mostly small teams; larger companies are far away and add travel costs to the price. The In Quảng Cáo Q7 workshop is only 3.8km from Rach Ong bridge — surveys on the booked day, and if lights or letters have issues later, we come quickly. See real projects on the page signboard making in District 7 and the product Advertising Signs.

Printed — then installed, no need to hire anyone else

Unlike regular print shops that just print and deliver, In Quảng Cáo Q7 has its own installation team: hanging banners, stretching backdrops on frames, applying glass decals on site, setting up standees and installing signs turnkey. District 8 signboards with menus, glass decals and grand-opening standees — one survey trip covers the whole shopfront. One point of contact from design file until everything stands neatly in place.

Item Regular print shop In Quảng Cáo Q7
Fast printing of documents, flyers, business cards Yes Yes — same day
Large-format printing (banner, PP, decal) in-house Usually sent elsewhere Large-format printers right in our workshop
Installation: hanging banners, applying decals, installing signs No Own installation team
Design included Depends Yes, mock-up approval via Zalo

Route from District 8 to the workshop

From Distance Driving time* Suggested route
Rach Ong Bridge 3.8 km about 11 minutes via Tran Xuan Soan
Chu Y Bridge 4.9 km about 14 minutes via Tran Xuan Soan
Rach Ong Market (Pham The Hien) 4.9 km about 14 minutes via Tran Xuan Soan

* Measured with Google Maps on 01/10/2026; times vary at rush hour.

A Backlit Film light box printed with shoes on a shopping street at dusk
Backlit Film advertising light box on a commercial street.

Contact 0866.511.099 (Phone/Zalo) or visit the workshop at 49 Mai Van Vinh, Tan Hung Ward, Ho Chi Minh City. Production and delivery: Monday – Saturday, 8:00–12:00 and 13:00–18:00. Consultation & orders via Zalo/hotline: Monday – Saturday 8:00–12:00 and 13:00–20:00, Sunday 14:00–19:00.

View directions to the workshop on Google Maps

Frequently asked questions

How long does a signboard in District 8 take?

From survey to installation usually 5–10 days depending on materials and size; framed banner signs are faster, raised letters + light boxes take longer. The exact schedule is fixed when the design is approved.

Is there a fee for the survey?

Surveys and quotes near the workshop are free; you only decide after getting the final price.

Can the old sign be removed?

Yes — our team removes the old sign and installs the new one in the same session when the site allows.

Related services

Some images on this page are illustrations.