Trung Son signboard making for eateries, cafés and spas in one of the busiest residential areas in the south of the city: the In Quảng Cáo Q7 workshop is just 3.4km from Trung Son via Him Lam Bridge — surveys on the appointment day, production at the workshop, installation at your shop.

Trung Son signboard making for F&B frontages
Trung Son shophouses have nice frontages but dense competition — signboards must stand out day and night: raised Mica letters with LED, light boxes with Backlit, double-sided projecting signs for pedestrians. Plus glass decals shading the afternoon sun and decoration matching the brand identity.
Areas 9A, 9B, the extended Nguyen Van Cu axis and streets No. 1–10 change premises owners constantly: when a new shop moves in, the old board must come down and the new one go up within a few days in time for the opening. The workshop is used to this rhythm — removal and installation done neatly in the same session when the premises allow, keeping the time the shop has no sign to a minimum.
All-in shop-opening combo
- Signs raised letters + light box — quoted after a free survey.
- Glass decals large-format printing from 50.000đ/m², applied on site.
- Menu PVC plastic, mounted covers with replaceable inserts — print 1 test book for approval first.
- Labels & stickers cup labels from 50.000đ, stickers from 1.500đ/sheet.
- Standee for openings from 90.000đ/set.
Related products


Survey – installation process
- Send a photo of the frontage + your idea via Zalo — receive a preliminary price range within the day.
- Arrange a survey and measuring at the shop, usually on the appointment day itself because the workshop is right next door.
- Approve the design mock-up on an actual photo of the shop's frontage.
- Production at the workshop; installation in a quiet time slot, including early morning.
- Acceptance with the lights switched on at the site; prices settled by survey, quoted before work starts.
Same-day surveys because we are so close
Because Trung Son signboard making is done with the workshop right next door, everything is fast: book a survey in the morning and get a mock-up in the afternoon, and later lighting faults are fixed within half a day after one call. See also the Trung Son printing page for the shop's whole set of print products. Contact 0866.511.099 (Phone/Zalo).

Contact 0866.511.099 (Phone/Zalo) or visit the workshop at 49 Mai Van Vinh, Tan Hung Ward, Ho Chi Minh City. Production and delivery: Monday – Saturday, 8:00–12:00 and 13:00–18:00. Consultation & orders via Zalo/hotline: Monday – Saturday 8:00–12:00 and 13:00–20:00, Sunday 14:00–19:00.
View directions to the workshop on Google Maps
Frequently asked questions
How long does Trung Son signboard making take?
Banner boards 2–4 days, raised letters + light boxes 5–10 days; survey and mock-up are usually done in the first 1–2 days.
Can you work outside hours so trading hours are not affected?
It can be arranged — many shops in the area choose installation early in the morning before opening; the schedule is settled when approving the design.
Roughly how much does Trung Son signboard making cost?
It depends on items and size: stretched banner boards are the most economical (banner printing from 35.000đ/m²), raised letters and light boxes are quoted after a survey — send a photo of the frontage via Zalo for a preliminary price range so you can weigh your budget first.
Some images on this page are illustrations.
Signboard types by premises type in the area
Trung Son Residential Area is right next to District 7, about ten minutes by vehicle from the workshop via Street 9A, so Trung Son signboard making is handled like an order in the same area: survey in the morning, quote within the day and installation at the time the customer sets.
| Premises type in the area | Board types commonly made | Notes for installation |
|---|---|---|
| Townhouses fronting the numbered streets | Alu board with raised letters or stretched banner board | Narrow frontages; horizontal boards stop at 3.2 m to avoid joins |
| Ground-floor shophouses | Light box with Mica face | Needs a power source ready at the frontage |
| Eateries in alleys | Small double-sided hanging signs | Pedestrians see it up close, so letters need not be very large |
| Clinics and spas | Alu board with stainless steel raised letters | Looks neat, easy to wipe |
| Offices in townhouses | Mica board with decal in the lobby | Fixed with expansion screws, no deep drilling |
| Corner shops with two frontages | L-shaped board or two separate boards | Must align at the same height on both sides |
| Rented premises | Free-standing frame board or stretched banner board | Removable, without leaving large drill holes |
Most Trung Son signboard making requests come from narrow-frontage townhouses and ground-floor shophouses. These two types of premises have limited width, so settling measurements before laying out the file matters more than choosing the board type.
Materials and lifespan of each board type
Each board type uses its own set of materials, and that set decides how long the board lasts and the initial cost.
| Sign type | Face material | Frame | Lifespan | Features |
|---|---|---|---|---|
| Stretched Hiflex banner on a frame | Hiflex banner 380 to 440 gsm | Oil-painted box-section steel frame | 2 to 3 years | Lowest cost, easy to replace the banner face |
| Alu with decal | 3 mm Alu sheet | Steel frame or fixed directly | 4 to 5 years | Flat, neat-looking, wipeable |
| Alu with raised Mica letters | Alu base, 10 mm thick Mica letters | Steel frame | 5 years | Solid raised letters, LED can be fitted behind the letters |
| Stainless steel raised letters | 304 stainless steel letters, mirror or brushed | Fixed directly onto the frontage | 5 years or more | Most durable, no board base needed |
| Light box with Mica face | UV-printed milky Mica | Extruded aluminium frame | 3 to 4 years | Evenly lit at night |
| Light box with backlit banner | Backlit banner | Box-section iron frame | 3 years | Large format, banner face replaceable |
| Double-sided hanging sign | Alu or double-sided banner | Steel frame with support arm | 3 years | Passers-by see it from both directions |
When the premises are rented, stretched banner boards and free-standing frame boards are chosen more because they can be taken down and moved. When the premises belong to the shop owner, stainless steel raised letters and light boxes are chosen more because they last long and do not need remaking.
Six steps to make a signboard
The Trung Son signboard making process has six steps, of which the survey step decides most of the cost and time.
- Survey the frontage: measure width, height, power source position and wall structure.
- Settle the board type and materials by the measurements and the customer's budget.
- Lay out the file to the real measurements, and send a mock-up placed on a photo of the frontage.
- Make the steel frame at the workshop, paint with anti-rust and then a top coat.
- Print and finish the board face, test-fit the raised letters at the workshop.
- Install at the premises, run electrical wiring if there are lights, clean up and test.
The mock-up placed on a photo of the frontage is the step that lets customers see in advance how the board looks in its exact place. It is also when changing the font or proportions is still easy, because once the frame is made, changes cost much more.
Text height by reading distance
Letter height on the board is calculated by the reader's distance, and that distance in residential areas is usually shorter than on major roads.
| Reading distance | Brand name letter height | Trade description letter height | Typical position |
|---|---|---|---|
| 3 to 5 m | 12 to 18 cm | 6 to 8 cm | Boards in alleys, lobby boards |
| 5 to 10 m | 20 to 30 cm | 9 to 12 cm | Townhouse frontage boards on numbered streets |
| 10 to 20 m | 35 to 50 cm | 14 to 18 cm | Frontage boards on major roads |
| Over 20 m | Over 55 cm | Over 20 cm | Boards on upper floors, rooftop boards |
The brand name should take about half the board height, with the trade description and phone number sharing the rest. When doing Trung Son signboard making for narrow frontages, the way to keep the board readable is to reduce the number of lines rather than the letter size.
Common mistakes when making signboards
The errors below recur in signboard orders, and most can only be fixed by remaking.
| Mistake | Consequence | How to avoid it |
|---|---|---|
| Estimating the shopfront measurements | The printed board is shorter or longer than the wall section | Measure with a tape, send the measurements with photos |
| Cramming in too many lines of text | No line can be read from a distance | Keep at most three groups of information on the board |
| Using 280 gsm banner for a stretched frame board | Sags in the middle after a few months | Use 380 gsm and up |
| Not anti-rust painting the steel frame | Rust streaks run down the board face after the rainy season | Anti-rust paint first, then the top coat |
| Fixing the board to brick walls with ordinary screws | The board gradually loosens over time | Use plastic or steel anchors according to the load |
| Running electrical wires exposed on the frontage | Looks messy and wires get damaged by sun and rain | Thread wires through conduit, running close to the board edge |
| Fitting LEDs too close behind Mica letters | Separate light spots visible instead of even light | Leave about 4 to 6 cm between the LED and the Mica face |
| Making a fixed board on rented premises | Leaves large drill holes when removed | Use a free-standing frame or stretched banner board |
Quick questions and answers from customers in the area
Below are the questions customers in the area often message the workshop, answered briefly according to what the workshop actually does.
| Question | Answer |
|---|---|
| Is the survey free | Yes, the workshop comes to measure and advise on the board type, quoting after having the real measurements |
| How long does it take? | Stretched banner boards 3 to 5 days, Alu with raised letters and light boxes 7 to 14 days |
| Can boards be made for rented premises | Yes, using a free-standing frame or stretched banner board that can be taken away |
| Can the banner face of an old board be replaced | Yes, keep the frame and only print a new banner face, so the cost is only part of the original |
| Do you apply for signboard permits | This is the responsibility of the premises owner and area management board; the workshop works to the permitted size |
| Do lit boards use a lot of electricity | They use LED so consumption is low; the workshop states the power rating clearly when quoting |
| How is the price calculated | By square metre of board face plus the frame and installation, from the listed price |
| Do you repair old boards | Yes, replacing faces, replacing LEDs, repainting frames and straightening misaligned letters |
Ordering signboards in the Trung Son area
The workshop takes Trung Son signboard making and nearby areas for eateries, cafés, retail shops, spas, clinics and offices, from survey to installation.
- Arrange for the workshop to come and survey, or send photos of the frontage with measurements via Zalo.
- Receive a mock-up placed on the frontage photo with a quote by board type.
- Settle the board type and materials; the workshop makes the frame and prints the board face.
- Installation at the time the customer sets, or collect the goods at the workshop at 49 Mai Van Vinh, Tan Hung Ward, Ho Chi Minh City if installing yourself.
Related items can be seen at advertising signs, light boxes and the group advertising printing. Trung Son signboard making orders with many items are combined into one installation visit.
Maintaining the board after installation
Maintenance is the part few people consider when ordering a board, but it decides whether the board still looks new after two years or has deteriorated. The list below shows what should be done periodically after Trung Son signboard making is finished.
- Wipe the board face with a damp cloth and clean water every three months, without solvents.
- Check the four corners of the steel frame once a year; sand and repaint rusty spots right away.
- Check the welds and wall-fixing lugs after each rainy season.
- For lit boards, check the power supply and wiring after each rainy season; connection points are the first to fail.
- Replace LED strips by cluster rather than individual bulbs, so the light colour is more even.
- Retighten the cable ties of stretched banner boards when the banner face starts to ripple.
- If raised Mica letters fade, replace just the letters and keep the board base.
The first part of an outdoor board to fail is not the printed face but the frame and electrical connections. The workshop repairs and replaces individual parts, so customers do not have to remake the whole board when just one detail deteriorates.
For stretched banner boards, the most economical way is to keep the frame and only replace the banner face when changing content or when the banner fades. The cost of each replacement is just the banner printing and stretching labour, so many customers doing Trung Son signboard making choose this type from the start, knowing they will change content after a year or two.
What makes up the cost of one board
The cost of one board consists of four separate parts, and knowing this split helps customers compare prices between two places correctly.
| Cost component | Charged by | Notes |
|---|---|---|
| Board face | Square metres of material | From the listed price for each material type |
| Steel frame | Linear metres of box section plus welding labour | Depends on size and number of braces |
| 3D letters | Per letter by height | The larger the letter, the more material and cutting labour |
| Lighting system | Linear metres of LED plus power supply | Only for boards lit at night |
| Installation | By height and difficulty | Above 3 m needs a large ladder or scaffolding |
| Transport | By distance | The Trung Son area and District 7 are charged as local |
Two places quoting the same figure per square metre of board face can still differ a lot once the frame, raised letters and installation are added. When customers ask the price of Trung Son signboard making, the workshop quotes each part separately so customers see clearly how much each part takes.
On the same route, the workshop also makes signboards in District 4. Information about the workshop and its installation capacity is on the page about us.
Need printing or signage in Ho Chi Minh City?
In Quảng Cáo Q7 runs its own print workshop in Tân Hưng Ward (former District 7), Ho Chi Minh City, producing and installing signage, banners, window graphics, exhibition booths and event displays. Send us the size, material, quantity and a photo on WhatsApp and we will get back to you.

Phone: +84 866 511 099 · Also on WeChat
Workshop: 49 Mai Văn Vĩnh, Tân Hưng Ward, Ho Chi Minh City

